International Journal of Industrial Engineering and Management
Volume 05, Issue 3, September 2014

Content

Quality Management of Special Purpose Buildings: A Case of National Forensic Laboratory in Ljubljana

Rok Cajzek, Uros Klansek
UDK:005.62
ABSTRACT (HTML) | FULL TEXT ARTICLE (PDF)


Lean Six Sigma in Slovenian and Serbian Manufacturing Companies

Dušan Gošnik, Ivan Beker, Klemen Kavčić
UDK:005.1
ABSTRACT (HTML) | FULL TEXT ARTICLE (PDF)


Selection of Supply Chain Performance Measurement Frameworks in Electrical Supply Chains

Masoud Rahiminezhad Galankashi, Ashkan Memari, Ali Anjomshoae, Azanizawati Ma'aram, Syed Ahmad Helmi
UDK: 658.286
ABSTRACT (HTML) | FULL TEXT ARTICLE (PDF)


Training Based on Sequential Need Analysis Process in a Public Sector Organization

Dr.C.Vijayabanu, C.Therasa
UDK:005.96
ABSTRACT (HTML) | FULL TEXT ARTICLE (PDF)


A Backward Approach for Maximizing Net Present Value of Multi-mode Pre-emptive Resource-Constrained Project Scheduling Problem with Discounted Cash Flows Using Simulated Annealing Algorithm

Aidin Delgoshaei, Mohd Khairol Ariffin, B. T. Hang Tuah Bin Baharudin, Zulkiflle Leman
UDK:658.5.012.2
ABSTRACT (HTML) | FULL TEXT ARTICLE (PDF)